Owner: Powergas
Consultant: Surbana Jurong
Applicator: FRP Products Co Pte Ltd
Good project reference for PC team as our coating is used for gas pipe for internal and external within Neste Oil’s plant.
Estimated quantity will be 4,000 m2 and paint value around $20,000.
Works had started in Nov 20 and expected to complete by Mid of 2021.
Owner: ExxonMobil
Main Contractor : SBM Offshore
Applicator: See Hup Seng
Paint value: $15,000
DATE OF COMPLETION: Nov 2018
Owner: Singapore Power
Main Contractor: Tender stage – Hai Leck and APECO
Applicator: Hai Leck Engineering
Quantity: 9,500m2
Paint Value: $80,000
DATE OF COMMENCED: July 2019
DATE OF COMPLETION: JSept 2020
Owner: Linde Gas
Main Contractor: Mutira (FE) Pte Ltd (Building Package), PEC Ltd (Piping and Racks Package)
Steel fabricator: G-Tech Metal (Building package)
Applicator: LNT and Hai Leck (Cooling Tower)
Quantity: 9,500m2
Paint Value: $50,000
DATE OF COMMENCED: AUG 19
DATE OF COMPLETION: DEC 19
EPC: Tecnicas Reunidas (TR).
Steel Fabricator: Kong Hwee Iron Works Pte Ltd
Applicator: LNT and Innovente
Quantity: 200 tons (6,000 m2)
DATE OF COMMENCED: APR 2020
DATE OF COMPLETION: 1 QTR 2021
Main Contractor: Sumitomo Chemical Engineering Pte Ltd
Applicator: FRP Products Pte Ltd
Total 3,000 m2
Estimated Paint Value: S$20,000
Duration: March to End 2021
EPC: Asia Projects Engineering Co
Consultant: Surbana Jurong
Steel fabricator: Boon Chang Structure Pte Ltd.
Application: LNT
There is 5 package of estimated total 10,000 tons of rack and supports. Nippon Paint is awarded for the first and second package which is 3,000 tons.
Paint Value: Estimated $80,000 for first and second package
Duration: Start in Mid 2020 and mid 2021
Main Contractor: Indat Engineering Pte Ltd
Paint Value: $30,000
Date of Completion: 2016
Main Contractor: Hitachi
Applicator: FERH International Pte Ltd
Date of Completion: 2017
Owner: Evonik
Main Contractor: AMEC Foster Wheeler
Applicator: Asia Sealand Engineering Pte Ltd
Date of Completion: 2018